Excerpt detail
Jerry Brown
/
Aug. 9, 20102. Build 8,000 MWs of Large Scale Renewables & Necessary Transmission Lines * The Legislature should codify a requirement that 33% of the state’s electricity be derived from renewable sources. This will create market certainty and drive investment in renewable technologies. * The California Energy Commission (CEC) should prepare a renewable energy plan by July 1, 2011, that will expedite permitting of the highest priority generation and transmission projects. * Federal and state agencies should carry out one integrated environmental review. * The CEC should “fast-track‟ projects based on their anticipated ability to deliver clean energy to market. The permitting time for these projects--which now can take 6 to 8 years--should be dramatically reduced, and in no case be longer than three years. * Work with regulators and utilities to develop and introduce Smart Grid technology to provide greater transmission efficiency, renewable energy and system reliability. * Renewable energy is being delayed because of overlapping review between the CEC and the Independent System Operator. Delays are also caused as various departments, such as Fish and Game and water quality agencies, weigh in on projects. As Governor, I will ensure that all agencies work together--with a sense of urgency--to permit projects and transmission lines without delay.
Source: Jerry Brown campaignTags: Environment, Jobs, Specific policy point or details



